Skip to content
Completed garage conversion exterior, Epsom, by Grand Innovations
Turn dead storage into your best room

Garage Conversions in Surrey & South West London

We convert single and double garages across Surrey and South West London into warm, dry, finished rooms that feel part of the house. Planning permission is often not needed, and we manage the Building Regulations for you. It starts with a free Cost Proposal.

FMB membersTrading since 2014See our reviews on GoogleRead our garage conversion cost guide

  • 3 to 5 weeks

    on site for a single garage conversion

  • Often no planning permission

    Building Regulations approval is normally needed, and we manage it

  • Based in New Haw, Surrey

    working across Surrey and South West London

  • 10% deposit

    then weekly billing for signed-off work

Do I need planning permission?

Often not

Planning permission is not usually required where the work is internal and does not enlarge the building. Conservation areas, newer estates and conditions on the original consent can change that, so we confirm the route for your property first.

Source: Planning Portal: planning permission for a garage conversion

Do Building Regulations apply?

Normally, and we manage them

Converting a garage, or part of one, into a room you live in will normally need Building Regulations approval. We manage the application and the building control inspections on your behalf.

Source: Planning Portal: Building Regulations for a garage conversion

How long does it take?

3 to 5 weeks

A single garage conversion typically takes 3 to 5 weeks on site. A double garage, or a conversion needing significant structural work, usually takes 5 to 8 weeks.

The most cost-effective room you'll add.

A garage conversion uses a structure you already own, so you gain a fully finished room without the foundations, roof and groundworks an extension demands. We handle the insulation, damp-proofing, heating, electrics and finishes. You deal with one team from first visit to final snag.

Because we're builders as well as fitters, we make sure the new room actually feels like part of the house: floor levels matched, the threshold made flush, and the frontage tidied so it reads as living space, not a converted garage.

The Grand Standard

  • Building Regs fully managed
  • One team: design through build
  • Weekly billing, no large deposits

Your Cost Proposal

A free site visit, then real numbers.

Most single garage conversions complete in 3 to 5 weeks. Book a free site visit and we'll send a fully itemised Cost Proposal, with no obligation to proceed.

Read our garage conversion cost guide

Unsure about planning and building regulations? Read our garage conversion guide

Buying a house with a garage you plan to convert? Get the work costed before you commit

Garage conversion blended into the home's frontage, Epsom
Seamless Integration

Warm, dry, and part of the house.

The difference between a converted garage and a genuine room is in the details. We insulate and damp-proof the full envelope, raise the floor to match the house, and make the threshold flush so the new space never feels like an afterthought.

Outside, we tidy the frontage by infilling the old garage opening and matching the brickwork, render and finishes, so the elevation reads as living space, protecting the look and value of your home.

  • Insulation & damp-proofing
  • Floor level & threshold
  • Heating & electrics
  • Matching the existing frontage
Compare the options

Single, double, integral or detached?

The kind of garage you have decides what it can become and how long the conversion takes.

Garage typeWhat it isWhat it often becomesTypical time on site
Single garageRoom for one car.A home office, home gym, playroom or utility room.3 to 5 weeks.
Double garageRoom for two cars. Both bays can be converted, or one kept as a garage or store.A larger living space or cinema room, or a self-contained annexe with a bedroom, shower room and kitchenette.5 to 8 weeks.
Integral garageA garage built into the house itself.A room that joins the ground floor directly, with the floor raised to match the house and a flush threshold between the two.By size: 3 to 5 weeks for a single garage, 5 to 8 for a double or where significant structural work is needed.
Detached garageA separate building, apart from the house.A home office, home gym or annexe. Converting it into a separate house may need planning permission, whatever the work involves.By size: 3 to 5 weeks for a single garage, 5 to 8 for a double or where significant structural work is needed.

Times are on site. Design and the Building Regulations application come first, and we confirm a detailed programme before work starts.

Source: Planning Portal: planning permission for a garage conversion

What It Could Become

One space, endless options.

  • 01

    Home Office

    A quiet, properly insulated workspace away from the household, wired for power, data and good lighting.

  • 02

    Home Gym

    A dedicated space for training at home, with hard-wearing flooring, ventilation and mirrors.

  • 03

    Cinema Room

    A snug, blacked-out media room with the wiring, acoustics and lighting planned in from the start.

  • 04

    Playroom

    A safe, warm room to keep toys and mess out of the main living space, and easy to repurpose later.

  • 05

    Self-Contained Annexe

    A bedroom, shower room and kitchenette for guests, family or independent living.

  • 06

    Utility Room

    Laundry, storage and services moved out of the kitchen to free up your main living areas.

Building Regulations

What building control checks.

A garage was built to keep a car dry, not to be lived in. These are the points Building Regulations look at when it becomes a room. We design for each one and arrange the inspections.

  • Infill wall and foundation

    The garage door opening is filled with a new wall, often with a window or door in it. A garage usually stands on a shallow slab, so the new wall may need a foundation of its own.

    Source: Planning Portal: in-fill garage door

  • Floor insulation and level

    The existing floor is usually strong enough for a room, but it needs thermal insulation, and its level can be raised to match the floors in the house.

    Source: Planning Portal: garage conversion flooring

  • Damp-proofing

    A new damp-proof membrane goes into the floor, and the existing walls are checked for weather resistance and damp-proofing before they are lined and insulated.

    Sources: Planning Portal: garage conversion flooringPlanning Portal: external walls

  • Ventilation

    Every new room needs adequate ventilation: a window that opens, background trickle ventilation, and extract ventilation where there is a shower room, utility room or kitchen.

    Source: Planning Portal: garage conversion ventilation

  • Fire separation and escape

    Where part of the garage stays as a garage, the wall between it and the new room needs adequate fire resistance, and any door in that wall should be fire-resisting and self-closing. Means of escape is considered for every new window.

    Sources: Planning Portal: internal wallsPlanning Portal: doors and windows

  • Electrics

    Electrical work in a home has to meet Part P of the Building Regulations, which covers electrical safety. Our notifiable electrical work is carried out by electricians registered with a government-authorised competent person scheme, or certified through building control.

    Source: GOV.UK: Approved Document P, electrical safety

How We Work

From first visit to final sign-off.

A clear, design-led process with Building Regs managed throughout and weekly billing, so you only ever pay for completed, signed-off work.

01

Feasibility & Site Visit

We assess the existing garage, floor levels and services, and confirm what's possible and the best layout for the room.

02

Design & Building Regs

Detailed design and a full Building Regulations application, with structure, insulation, ventilation and fire safety handled on your behalf.

03

Insulate & Damp-proof

Floor, walls and ceiling insulated and damp-proofed to create a warm, dry thermal envelope that meets current standards.

04

Fit-out

Flooring, heating, electrics, plastering and decoration. The room is finished properly to match the rest of the house.

05

Snag & Handover

A thorough snagging inspection, building control sign-off, and a full handover of your new room.

Our commitments

How your project is protected.

Each of these is written into our published Quality Management Policy, signed by our Director.

  • Building control completion certificate

    All work is carried out to comply with the Building Regulations. We obtain the building control applications, notifications and completion certificates wherever the work requires them.

  • Snagging cleared before handover

    As completion approaches we walk the project with you, record every snagging item and clear the list before formal handover.

  • Defects put right

    If a defect in our workmanship emerges after handover, we put it right promptly and at no cost to you.

  • Registered trades for gas and electrics

    All gas work is carried out only by Gas Safe registered engineers. Notifiable electrical work is carried out by electricians registered with a government-authorised competent person scheme, or certified through building control.

  • Insurance held

    We maintain Public Liability and Employers' Liability insurance, and evidence of cover is available on request.

  • FMB membership

    We are a member of the Federation of Master Builders (FMB). If a matter ever remained unresolved, we can offer you access to the FMB's dispute resolution service.

Read our company policies
Epsom Garage Conversion
Case Study · Epsom, Surrey

Epsom Garage Conversion

The Challenge

Integrating the existing, lower-level garage slab with the main house floor level while ensuring maximum ceiling height for the new living space.

Our Solution

We engineered a stepped foundation and structural raised floor that perfectly matched the home's interior levels, creating an invisible, flush threshold between the original and new spaces.

Garage Conversion
See the Epsom garage conversion
Recent Conversions

A look at our work.

Epsom Garage Conversion, photo 1
Epsom Garage Conversion, photo 2
Epsom Garage Conversion, photo 3
Epsom Garage Conversion, photo 4
Epsom Garage Conversion, photo 5
Epsom Garage Conversion, photo 6
Epsom Garage Conversion, photo 7
Epsom Garage Conversion, photo 8
Epsom Garage Conversion, photo 9
Epsom Garage Conversion, photo 10
Epsom Garage Conversion, photo 11
Epsom Garage Conversion, photo 12
Epsom Garage Conversion, photo 13
Epsom Garage Conversion, photo 14
Epsom Garage Conversion, photo 15
Epsom Garage Conversion, photo 16
What's Included

In your garage conversion.

FAQs

Garage conversion questions, answered.

Further reading

Guides and articles.

Planning, cost and how the work is done, written by the team that builds it.

Let's unlock your extra room.

Book a free, no-obligation site visit. We'll assess your garage, talk through how you'd use the space, and send a clear, itemised proposal, usually within 24 hours.

Step 1 of 2 · About your project

A rough idea is fine. It helps us plan the right scope with you.

So we can check the project is in our service area.

Takes 30 seconds · No obligation · Free proposal within 24 hours

Prefer to talk? Call 01932 950158
No large deposits required
Free proposal within 24 hours
Fully insured & accredited
Rather talk it through? 01932 950158
“Very helpful, proactive and competitive design/build quote. The initial video consultation was very useful, and Conor was very proactive in following up on my questions. The detailed cost breakdown was very helpful in understanding where I could perhaps reduce costs. If you are looking for a design and build company to discuss your project, I have no hesitation in recommending Conor and the Grand Innovations team.”
Ravensbourne · Design/build cost proposal · via Trustpilot
CallFree Cost Proposal